Wondering if someone can help me work out why I get garbage when I try and connect my Iris to Mission Planner 1.2.99 and APM Planner 2.08 on windows? I’ve done everything I can possibly think of, tried different ports setting etc and read posts but all I get is garbage, see attached screenshots.
On mac APM 2.08 I sometimes get garbage but mostly its connects normal and I can download logs but when I try to load a log it says something like: “600+ lines of code wrong, data maybe corrupted”. Latest log attached just a short hover flight in STB. Copter works fine no problem and connects normally but just not to the terminal.
What can I do?
Cheers