The attached screen shot shows the time scale in minutes on top of graph. While I get the time scale in Line Number at the bottom of graph, what button should I press, and where to get this time scale in minutes to display ?
A reply in the forum asked people to use APM Planner 2. But the attached screenshot seems shows Misssion planner which I frequently use.
I replied you before trying on APM Planner. After I opened APM Planner 2, I could not activate the time display on the top of graph.
The only thing I do which is nearest is CHECK the box saying “Use Time on X-axis” on any graph.
Could you please advise where I can get this time in Minutes displaying on the top of any graph ?
Well, my mistake it is indeed Mission Planner, but a very old one. (I checked 1.3.50 from 2017 and it had this bar) It was removed somewhere in the past 6 years,